06 15051224 Operations Services
for 50MBOPD EPF
at North Kuwait
USD. 26
Million
2015 2021 Kuwait
Oil
Company
North
Kuwait
Operate on assigned shift, all equipment of assigned units within
the EPF-50 plant with all associated facilities e.g. Crude Oil
sweetening facilities and Gas sweeting facilities, Sulphur
Recovery units (SRU’s) along with all support facilities such as
Utilities, steam generation system by Monitoring Workstations
The facilities to be operated within design specification and
conform to KOC operating guidelines.
07 28916 Early Production
Facilities of 50
MBOPD capacity for
North Kuwait
Jurassic Production
(EPF-50)
USD 320
Million
2007 2014 Kuwait
Oil
Company
North
Kuwait
Contract to build, own & operate an Early Production Facility to
process 50 MBOPD of crude & 175 mmscfd of gas
Scope of Work:
Design, Engineering, Supply, Installation, Commissioning,
Operations and Maintenance of an Early Production Facility
(EPF) for KOC for treating of sour crude and gas to remove
the H2S and transfer the sweet products to KOC Gathering
Centre.
24 Production wells from a deep Jurassic reservoir to produce
to this facility.
Light sour crude of API 44 to 46.
H2S upto 20,000 ppm.
Design, Engineering and construction of approximately 330
kms of 6” flowline and 12 kms Export Pipeline.
50,000 bbl/day Sweet Crude Export
175 mmscfd Sweet Dehydrated Gas Export.
135 TPD Sulfur Recovery Unit
22% Design Maximum water Cut
Detailed engineering of the EPF and all associated facilities.
Equipment Fabrication & Manufacturing
Site Construction & commissioning of EPF & related
facilities.
Operate the EPF to deliver the crude & gas to specifications
required by KOC.
Maintenance of EPF
08 98B-224
Adjustment
Order # 06
Horizontal Pumping
Systems (HPS) for
Enhanced Effluent
USD. 6
Million
2003 2007 Kuwait
Oil
Company
KOC South
East Kuwait
Near GC-2
Network of HPS for enhanced disposal of effluent water in
South East Kuwait. This enhanced HPS network is capable of
disposal of about 50,000 BPD of effluent water into two disposal
wells.