LIST OF OIL & GAS PRODUCTION FACILITIES CONTRACTS. (2003-2022)
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
01 20157422 Jurassic Production
Facility – 4 (JPF4) at
North Kuwait
USD 398
Million
2021 2029 Kuwait
Oil
Company
North
Kuwait
Project Scope comprises of design, engineering, fabrication,
installation, testing, pre-commissioning, commissioning, O&M
of Jurassic Production Facility (JPF) with a capacity of
processing 50 STMBOPD Oil and 150 MMSCFD Gas & 240
TPD of molten sulphur in North Kuwait comprising of the
following major process systems:
Crude Oil Processing
Gas/Oil Separation Plant
Crude Dehydration & Desalting Plant
Crude Stabilization Plant
Stabilized Crude Measurement & Export System
Gas Compression Plant
Gas Sweetening Plant
Gas Dehydration Plant
Vapor Recovery Units
Gas Metering & Export System
Plant Refrigeration
Fire Water System
Sulphur Recovery Unit
Tail Gas Treating Plant
Incineration & Flare System
Raw Water Treating Plant
Effluent Water Treatment Plant & Disposal Systems
Chemical Injection Systems
Steam Systems- Heat Recovery Steam Generators & WH
Boilers
Electrical Power Generation Plant
Plant Control & Safety Systems
Data Communication System
Control Room, MCC Building, Workshops
Other Supportin
g
Utilities
Page 2 of 5
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
02 16052988 Jurassic Production
Facility - 3 (JPF-3) –
North Kuwait
USD 377
Million
2016 2023 Kuwait
Oil
Company
North
Kuwait
Project Scope comprises of design, engineering, fabrication,
installation, testing, pre-commissioning, commissioning, O&M
of Jurassic Production Facility (JPF) with a capacity of
processing 40 STMBOPD Oil and 104 MMSCFD Gas & 200
TPD of molten sulphur in North Kuwait comprising of the
following major process systems:
Crude Oil Processing
Gas/Oil Separation Plant
Crude Dehydration & Desalting Plant
Crude Stabilization Plant
Stabilized Crude Measurement & Export System
Gas Compression Plant
Gas Sweetening Plant
Gas Dehydration Plant
Vapor Recovery Units
Gas Metering & Export System
Plant Refrigeration
Fire Water System
Sulphur Recovery Unit
Tail Gas Treating Plant
Incineration & Flare System
Raw Water Treating Plant
Effluent Water Treatment Plant & Disposal Systems
Chemical Injection Systems
Steam Systems- Heat Recovery Steam Generators & WH
Boilers
Electrical Power Generation Plant
Plant Control & Safety Systems
Data Communication System
Control Room, MCC Building, Workshops
Other Supporting Utilities
03 16052988
AO # 3
Phase 1 Upgrade of
Jurassic Production
Facility – North
Kuwait
USD 118
Million
2021 2023 Kuwait
Oil
Company
North
Kuwait
Upgrade of the Oil Treatment System & Gas Treatment System
of JPF to increase production capacity of Gas from 104 mmscfd
to 150 mmscfd and Oil from 4o MBOPD to 50 MBOPD
Page 3 of 5
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
04 37195
&
18052492
GSF
Turnkey
EPC and
upgradation
and then
continuation
of the
contract in
back
to back
contract
18052492.
Expansion of Gas
Sweetening Facility
(GSF) in West
Kuwait & Associated
Services.
Expansion of Gas
Sweetening Facility
(GSF), West
Kuwait, by adding a
new train thereby
increasing capacity
of existing gas
facility from 50
MMSCFD to 90
MMSCFD.
USD 102
Million
2018 2022 Kuwait
Oil
Company
West
Kuwait
The scope of Services to be performed by the Contractor
comprises of the following:
Stage-I of additional GSF Train
Build an additional GSF Train for an operating capacity of 40
MMSCFD which shall be tied in and integrated with existing
GSF built and operated under the Contract No. 37195. including
design, engineer, procure, construct, carry out all tie-ins with
existing facilities, carry out all tie-ins with export gas (both
GSFs) to HP export line (700 -750 psig), test, commission and
carry out O&M.
05 36016 Gas Compression
Services for GC-16
& Gas Re-injection
in Minagish
(GCP/GRIP)
USD 70
Million
2008 2019 Kuwait
Oil
Company
West
Kuwait
Contract to design, build, test, commission, operate & maintain
Gas Compression Package (GCP) near GC-28 at TP-4 using the
gas from GC 16 & 28 and Gas Re-Injection Package (GRIP) near
wells MN 129 & MN 140.
Commemorated by KOC, WK for SPETCO’s contribution
in reduction of Gas flaring from 40% to less than 1%.
Scope of Work:
Design, Engineering, Supply, Installation, Commissioning,
Operations and Maintenance of Gas Compression Package
(GCP) near GC-28 at TP-4 using the gas from GC 16 & 28
and Gas Re-Injection Package (GRIP) near wells MN 129 &
MN 140.
Detailed engineering of the GCP & GRIP and all associated
facilities.
Equipment Fabrication & Manufacturing
Site Construction & commissioning of GCP & GRIP &
related facilities.
Operate the GCP & GRIP to deliver the gas to specifications
required by KOC.
Maintenance of GCP & GRIP
Page 4 of 5
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
06 15051224 Operations Services
for 50MBOPD EPF
at North Kuwait
USD. 26
Million
2015 2021 Kuwait
Oil
Company
North
Kuwait
Operate on assigned shift, all equipment of assigned units within
the EPF-50 plant with all associated facilities e.g. Crude Oil
sweetening facilities and Gas sweeting facilities, Sulphur
Recovery units (SRU’s) along with all support facilities such as
Utilities, steam generation system by Monitoring Workstations
The facilities to be operated within design specification and
conform to KOC operating guidelines.
07 28916 Early Production
Facilities of 50
MBOPD capacity for
North Kuwait
Jurassic Production
(EPF-50)
USD 320
Million
2007 2014 Kuwait
Oil
Company
North
Kuwait
Contract to build, own & operate an Early Production Facility to
process 50 MBOPD of crude & 175 mmscfd of gas
Scope of Work:
Design, Engineering, Supply, Installation, Commissioning,
Operations and Maintenance of an Early Production Facility
(EPF) for KOC for treating of sour crude and gas to remove
the H2S and transfer the sweet products to KOC Gathering
Centre.
24 Production wells from a deep Jurassic reservoir to produce
to this facility.
Light sour crude of API 44 to 46.
H2S upto 20,000 ppm.
Design, Engineering and construction of approximately 330
kms of 6” flowline and 12 kms Export Pipeline.
50,000 bbl/day Sweet Crude Export
175 mmscfd Sweet Dehydrated Gas Export.
135 TPD Sulfur Recovery Unit
22% Design Maximum water Cut
Detailed engineering of the EPF and all associated facilities.
Equipment Fabrication & Manufacturing
Site Construction & commissioning of EPF & related
facilities.
Operate the EPF to deliver the crude & gas to specifications
required by KOC.
Maintenance of EPF
08 98B-224
Adjustment
Order # 06
Horizontal Pumping
Systems (HPS) for
Enhanced Effluent
USD. 6
Million
2003 2007 Kuwait
Oil
Company
KOC South
East Kuwait
Near GC-2
Network of HPS for enhanced disposal of effluent water in
South East Kuwait. This enhanced HPS network is capable of
disposal of about 50,000 BPD of effluent water into two disposal
wells.
Page 5 of 5
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
Water Disposal in
South East Kuwait
Design, Engineering, Installation and Operations of
Horizontal Pumping Systems for GC-1, GC-6, GC-11
and GC-2 on a lease basis.
Maintain inventory of the water disposal in South East
Kuwait.
Maintain the level in the Holding Tank at GC – 2.
09 98B-224
Adjustment
Order # 05
Early Production
Facilities for SA-153
KD 4.6
Million
2003 2007 Kuwait
Oil
Company
North
Kuwait
Near GC-
23
Owned and operated on a lease basis an Early Production
Facility (EPF) for processing and testing of sour crude and gas
from a new light oil discovery in North Kuwait. The facility
strips the H2S in the inlet crude and gas and transfers the sweet
products to KOC GC-23.
Scope of Work:
Design, Engineering, Supply, Installation,
Commissioning, Operations and Maintenance of an
Early Production Facility (EPF) for KOC for treating of
sour crude and gas to remove the H2S and transfer the
sweet products to KOC Gathering Centre. This facility
comprises of 2 stages of separators, Amine Contactors,
Amine Still column for DGA regeneration, Fuel gas
powered Hot Oil media Heater, Crude Oil Stabilizer
tower, Flare system, Thermal Oxidizer for incineration
of H2S, Chilled Water Unit, etc.
Design, Engineering and construction of approximately
17 kms of flowline and product lines of 4”, 6” and 8” on
a turnkey basis
Simulations of process using PRO 11 process
simulation software
Reduction of the H2S concentration in the treated crude
down to less than 70 ppm and treated sweet gas to less
than 4 ppm from the inlet stream H2S concentration of
10,000 ppm.
Maintenance of independent power generation units for
the facility operations.