About

Gas Compression & Re-injection Facility

KOC has commissioned SPETCO to design, build, test, commission, operate & maintain   Gas Compression Package (GCP) near GC-28 at TP-4 using the gas from GC 16 & 28 and Gas Re-Injection Package (GRIP) near wells MN 129 & MN 140. The project is intended to increase the gas export capability and reduce the gas and condensate flaring in the Gathering Center 16 (GC-16), in line with the Kuwait Oil Company’s objective of achieving zero flaring. 

SCOPE OF WORK  

  • Design, Engineering, Supply, Installation, Commissioning, Operations and Maintenance of Gas Compression Package (GCP) near GC-28 at TP-4 using the gas from GC 16 & 28 and Gas Re-Injection Package (GRIP) near wells MN 129 & MN 140. 
  • Detailed engineering of the GCP & GRIP and all associated facilities. 
  • Equipment Fabrication & Manufacturing 
  • Site Construction & commissioning of GCP & GRIP & related facilities. 
  • Operate the GCP & GRIP to deliver the gas to specifications required by KOC. 
  • Maintenance of GCP & GRIP 

GCP & GRIP Facility comprises of: 

  • TV (compressor – 1no.) - 6 MMSCFD  
  • GCP (4 nos. compressors) - 40 MMSCFD 
  • GRIP (4 nos. compressors) - 60 MMSCFD for Gas re-injection 
  • Interconnecting pipelines total of 16 main lines 

HSE Highlights: 

  • Achieved more than 1 Million manhours (1,154,263) with ZERO Loss Time Injury (LTI) 
  • Targeted KPIs achieved successfully  
  • Overall HSE Training Achieved to 75% as per Training Matrix which includes Third party training by competent trainer: H2S hazards, First Aid, Defensive driving and Commentary driving 
  • Project Employees actively participated in Monthly Safety quiz competitions and SOS card reporting system and received awards from the Management. 
  • Project drivers received Best Driving Attitude (BDA) as per IVMS data.